Consultant service


No. Project Owner Workscope

1

Dung Quat 1 Thermal Power Plant
Quang Ngai Province

Sembcorp Utilities Pte Ltd

- Collecting and generalizing data

- Site inspection, bathymetric survey, geotechnical investigation 

- Mathematical and numerical modeling, ship movement simulation

- Preparation of Pre-FS and FS Report

- Basic Design

- Preparation of EIA Report

- Application for supplement of Dung Quat Specialized Port to master plan of Seaport Group 3

- Application for approval of specialized port of Dung Quat Thermal Power Plant

2

Ha Tinh Formosa Plastics Steel Complex Power Station Phase 1
Ha Tinh Province

Hung Nghiep Formosa Ha Tinh Steel (Formosa Plastics Group)

Construction detail planning (scale 1/500) Jetty portion (Phase 1)

3

Vinh Tan 1 BOT Thermal Power Plant
Binh Thuan Province

Vinacomin - China Southern Power Grid / Vinh Tan 1 Power Company Limited

- Collecting and generalizing data
- Site inspection, bathymetric survey and geotechnical investigation
- Preparation of FS Report
- Basic Design
- Preparation of EIA Report
- Application for approval of port of Vinh Tan 1 power plant

4

Long Son Cement Port System
Thanh Hoa Province, Binh Dinh Province, Khanh Hoa Province

Long Son Cement

- Long Son jetty in Nhon Hoi (Khanh Hoa): Application for Supplement of Long Son jetty into the Master Plan of Seaport Group 4, application for jetty detailed location and scale, preparation of investment project report and basic design, preparation of construction design
- Long Son jetty in Ninh Thuy (Binh Dinh): Application for Supplement of Long Son jetty into the Master Plan of Seaport Group 3, application for jetty detailed location and scale, preparation of investment project report and basic design, preparation of construction design

 - Long Son Container Port in Nghi Son (Thanh Hoa): Application for jetties detailed locations and scales, preparation of investment project report and basic design, preparation of construction drawing design, preparation of EIA Report, application for Permission of Dumping at sea

 - (all port): Bathymetric survey

5

Vinh Tan 3 Power Plant
Binh Thuan Province

Vinh Tan 3 Energy JSC.

Phase 1:
. Identifying the ownerships of port works and facilities
. Determining procedure for obtaining approval of port of Vinh Tan 3 Power Plant
. Proposing Port management and operation

Phase 2:

. Site inspection, bathymetric survey and geotechnical investigation
. Design review and preparation of FS Report
. Basic Design and Engineering Consultancy Service (Prepare owner technical requirements for bidding documents, reviewing proposals from bidders ans assist the Client in replying questions from bidders, evaluation of tenders)
. Application for approval of port of Vinh Tan 3 power plant

6

Nam Dinh Thermal Power Plant
 

Nam Dinh Province

Taekwang Power Holdings

- Preparation of specialized port investment project report

- Survey, research, develop, analyse and study all the possible alternatives for transporting and delivering the coal from Quang Ninh province area to the Nam Dinh Power Plant site

7

Song Hau 1 Thermal Power Plant Project
Hau Giang Province

PetroVietnam Power Corp/ Vietnam Oil and Gas Group (PetroVietnam)

Specialized Port Portion:
- Topographical and geotechnical survey
- Port planning
- Preparation of port construction investment report 
- Technical design
- Cost estimation

8

Long Phu 2 Thermal Power Plant Project
Soc Trang Province

Tata Vietnam (Tata Group)

- Specialized port Investment project preparation and Application for VMA approval

9

Long An 1 Thermal Power Plant Project
Long An Province

Daewoo Engineering & Construction

Preparation of specialized port investment project proposal

10

Nghi Son 2 BOT Thermal Power Plant Project
Ha Tinh Province

Marubeni and KEPCO

Preparation of specialized port investment project report

11

Pha Rung General Import Port
Quang Ninh Province

Dat Viet Energy Investment Jsc.

- Geotechnical and topographical survey
- Reclamation design
- Application for approval of Port and port announcement
- Construction drawings design of office building and berths 
- Construction Inspection of 02 work items:
. Material berth reclamation
. 5,000DWT jetty

12

Dien Cong Thermal Power Plant Project
Quang Ninh Province

Dien Cong Thermal Power Jsc.

Preparation of specialized port planning report

13

Bac Giang Thermal Power Plant Project
Bac Giang Province

Bac Giang Thermal Power Jsc. (Saigon Invest Group)

. Preparation of planning report
. Topographical survey and topography mapping scale of 1/1,000
. Preparation of specialized port report
. Preparation of Project investment report  
. Application for approval from MOT and VIWA
. Preparation of fuel transport channel report

14

Binh Dinh Electricity Center
Binh Dinh Province

Sai Gon – Binh Dinh Energy Jsc. 
(Saigon Invest Group)

- Preparation of specialized port report
- Preparation of Project investment report and Basic design
- Topographical and geotechnical survey
- Mathematical modelling
- Prepare dossier to negotiate with MOT and VMA

15

An Khanh 2 Thermal Power Plant
Thai Nguyen Province

An Khanh Thermo Power Joint Stock Company

Prepareation of specialized port planning report

16

Bac Lieu Electricicty Center
Bac Lieu Province

EVN and Sojitz Kyushu Corporation

Prepareation of specialized port planning report

17

Uong Bi Thermal Power Plant Project
Quang Ninh Province

Electricity of Vietnam (EVN)

Prepareation of specialized port planning report

18

Phu Tho 2x300MW Thermal Power Plant Project
Phu Tho Province

Electricity of Vietnam (EVN)

- Prepareation of specialized port planning report
- Specialized Port construction investment project preparation (including of EIA)

19

Hai Duong Thermal Power Plant Project 
Hai Duong Province

JAKS Resources Berhad and China Power Engineering Consulting Group (CPECC)

- Preparation of waterway transport channel planning report
- Preparation of specialized port planning report
- Preparation of specialized port construction invetsment project report
- Reclaimation and backfilling design

20

Duyen Hai 3 Thermal Power Plant Project 
Tra Vinh Province

EVN 

Prepareation of Pre-FS report

21

Duyen Hai 2 Thermal Power Plant Project
Tra Vinh Province

Janakuasa SDN BHD

- Topographical survey
- Preparation of jetty planning report
- Geotechnical survey

22

Phu Quoc Thermal Power Plant Project
Phu Quoc Province

Vinacomin  

Prepareation of specialized port planning report

23

Son My Electricity Center
Binh Thuan Province

INTL POWER
/SOJITZ

Detailed planning (scale 1/2,000) the specialized port

24

Mong Duong 1 Thermal Power Plant Project
Quang Ninh Province

EVN

Work Item:
- Contruction drawings design
- Cost estimation

25

Thai Binh 2 Thermal Power Plant Project
Thai Binh Province

PetroVietnam Power Corp/ Vietnam Oil and Gas Group (PetroVietnam)

Specialized port planning and basic design

26

Thai Binh 1 Thermal Power Plant Project
Thai Binh Province

EVN

Specialized port planning and basic design

27

Construction invesment project of General Port of Military Petrochemical Jsc.
Hai Phong city

Military Petrochemical JSC. (MIPEC)

- Preparation of planning report
- Application for approval of VMA

28

Cong Thanh Thermal Power Plant Project
Thanh Hoa Province

Cong Thanh Thermal Power Joint Stock Company

Prepareation of specialized port planning report

29

Quang Phuc Cement Factory Specialized port construction investment project 
Quang Binh Province

Vietnam Construction Materials Ltd., Co.

Review construction investment project report

Hoa Mai
Hoa Đào